The brief
Halden's operators watched six different tools to keep an offshore wind farm running. Alarms were missed, and new staff took months to learn the systems.
What we did
We spent two weeks in the control room, then designed and built one dashboard: a map of the farm, the turbines that need attention first, and the weather that will matter next.
They listened first and designed second. It shows in every screen.
Results
- 62% faster response to alarms
- 1 screen instead of six
- 99.98% uptime since launch
- Client
- Halden Energy
- Services
- Product design, Engineering